From Datasheet to ATE: A Systematic Method for Power-IC Test Program Development
A four-stage method for turning a power-IC datasheet into a production test program with defensible limits and a written record of engineering decisions.
Inside this paper
- Extraction, normalization, test planning, and guardbanded limits
- Worked example: TI TPS7A20 low-noise LDO
- An 18-question checklist to run before writing test code
- A decision-log template